At a Glance

SLIDE DOWN


Investor Relations
-Terna Energy

TERNA ENERGY Group was established in 1997 and since then has been active in the energy sector with emphasis on renewable energy sources. The Group constructs and operates renewable energy sources facilities focusing in wind and solar energy as well as hydroelectric projects but is also active in the management and exploitation of waste and biomass.

The total installed power of the Group currently stands at 895 MW, of which 763MW are installed in Greece,102MW in Poland and 30MW in Bulgaria. The growth of TERNA ENERGY Group continues smoothly and its investment program is evolving at an intensive pace. The Group’s goal is the total installed capacity to reach 6.4 GW within the next seven-year period. In this context, new wind and photovoltaic parks projects with a total capacity of approximately 4 GW (the Group has positioned itself in time in the market of offshore wind farms, where it plans to develop parks in the Greek seas via a joint venture with OCEAN WINDS). At the same time, hydroelectric parks, and pumping storage projects with a total capacity of 1.25 GW are being developed and designed, while storage projects and other technologies (biogas, biomass, etc.) are also being promoted, of total power about 0.25 GW.

During the past ten years the Group has implemented investment plan
amounting to €2 billion approximately.

The Company is listed in the Athens Exchange since 2007.

ENERGY

WIND ENERGY

HYDROELECTRIC PROJECTS

PUMPED STORAGE PROJECTS

SOLAR ENERGY

HYBRID PROJECTS

WASTE MANAGEMENT

BIOGAS PROJECTS

CONSTRUCTIONS

PUBLIC TECHNICAL PROJECTS

PRIVATE TECHNICAL PROJECTS

TRADE IN ELECTRIC ENERGY

CONSTRUCTION AND OPERATION OF INFRASTRUCTURE AND OTHER PUBLIC INTEREST PROJECTS