REStories

SCROLL DOWN


Peloponnese Region: from being a straggler, now a pioneer in waste management

Peloponnese Region: from being a straggler, now a pioneer in waste management

Peloponnese’s integrated waste management project TERNA ENERGY started to implement through the special purpose vehicle PERIVALLONTIKI PELOPONNESOU S.A., a result of a Partnership of Private and Public Sector (PPP), now offers a permanent solution to uncontrolled landfills, the majority of which in the country were located in the Peloponnese and for which Greece has been…

The significant Amphilochia pumped-storage project enters the final stretch

The significant Amphilochia pumped-storage project enters the final stretch

Storing energy, a necessary condition for initiating Greece’s energy transformation and for TERNA ENERGY’s equal participation in the clean energy revolution, is now being realised, evoking a well-deserved feeling of pride in all of us. This feeling of pride is only normal, considering the company’s significant contribution to promoting the concept of large scale pumped…

The largest hybrid project to produce clean energy in Europe

The largest hybrid project to produce clean energy in Europe

By TERNA ENERGY at Amari, Crete The largest hybrid project in Europe and the first of its size and characteristics in Greece, the Hydro Pumped Storage in Amari, Crete, is a model green investment of strategic importance that creates 1,000 new jobs during the construction of the project and at least 100 during operation period.…

“Agios Georgios” Wind Farm: A benchmark project for Greece

“Agios Georgios” Wind Farm: A benchmark project for Greece

In the middle of the Aegean Sea, between the Saronic Gulf and the Western Cyclades, the uninhabited islet of 4,300 acres of Agios Georgios (or Saint George) located 12 miles from Sounio and 20 from Hydra, was meant to be the point where a benchmark project for Greece’s energy transformation and development was carried out.